AWS Migration: US to Canada

Move your AWS workloads to Canada. Without breaking production.

Migrating AWS workloads from a US region to a Canadian region means rebuilding your infrastructure in ca-central-1 (Montreal) or ca-west-1 (Calgary), replicating your data north, and cutting traffic over without losing anything. Companies do it for three reasons: Canadian data residency, lower latency for Canadian users, and customer or public-sector requirements that the data stay in country. AWS does not move workloads for you. It is a project, and this is what it looks like.

The corridorDELIVERED

US regions, north.

Targetca-central-1
Orca-west-1
ComputeRebuilt via IaC
DataReplicated live
CutoverStaged, reversible
Old regionKept until stable
Why Companies Move North

Four reasons this lands on the roadmap.

Usually it is not one of these on its own. It is a customer asking a question in a procurement form, and the honest answer being uncomfortable.

01 · RESIDENCY

Data residency and sovereignty

Canadian customers, regulators and public-sector buyers increasingly expect data about Canadians to sit in Canada. PIPEDA governs private-sector personal data federally, and Quebec Law 25 tightened obligations around personal information including transfers outside the province. Neither is a simple localisation switch, which is exactly why the question gets messy. We build and document the infrastructure side, including region controls and evidence that data stays where you say it does. Your counsel or privacy officer assesses the legal obligations. We are engineers, not lawyers.

PIPEDAQuebec Law 25
02 · LATENCY

Latency for Canadian users

Serving Toronto or Vancouver users from Virginia works, until it does not. Round trips add up in chatty applications, and a Canadian region removes a whole class of complaints that get logged as "the app feels slow" without anyone identifying the cause. This is usually a secondary driver that makes the residency business case easier to sign off.

In-countryRound trips
03 · PROCUREMENT

Deals that ask the question

Canadian public-sector and enterprise procurement routinely asks where data is stored and processed. An honest answer of "US regions" can stall a deal or add a security review cycle you did not budget for. Moving is often driven by one contract that will not close otherwise, which is why these projects tend to arrive with a date attached.

Public sectorEnterprise RFPs
04 · COST

Costs differ, slightly

Per-unit pricing varies between AWS regions, so the same architecture rarely costs exactly the same after a move, in either direction. It is usually a small factor next to residency, but it should be a known number rather than a surprise. The assessment models the target region against your current usage so the business case includes the run cost, not just the project cost.

ModelledBefore you commit
What Actually Moves

Some of this is easy. The data is not.

A region migration is not one job, it is six, and they carry very different risk. Here is what each layer involves and where the real work sits.

LayerHow it movesDifficulty
Stateless computeRedeployed into the new region from infrastructure as code. Nothing is copied, it is rebuilt.Easiest. If your IaC is good, this is close to a parameter change.
Container platformsECS or EKS re-provisioned from task and cluster definitions, images pushed to a registry in the new region.Straightforward, assuming definitions are in code rather than console clicks.
DatabasesRDS cross-region snapshot copy for simple moves, or DMS replication running in parallel when downtime must stay near zero.The hard part. Data volume drives the approach and the timeline.
Object storageS3 cross-region replication to seed the target, then a decision about which bucket is authoritative and when.Mechanically simple, but large buckets take real time to sync.
DNS and trafficWeighted routing to shift traffic gradually, with a rollback window while both regions are live.Low risk if planned, high risk if it is a single flip on the night.
The awkward remainderRegion-specific services, hardcoded region strings and ARNs in code and IaC, region-pinned AMI IDs, CI/CD assumptions.Small individually, and the usual source of cutover surprises.
The pattern that matters: everything above the data layer is a rebuild, and rebuilds are predictable. The database is the only part where the clock is genuinely against you, which is why the plan is built around it rather than around the application.
How We Run It

Five phases, reversible until the last one.

Phase 1

Assessment

Full inventory of what runs where, a scan for region dependencies (hardcoded regions, ARNs, AMI IDs, services that differ in the target), and a cost model of the Canadian region against your current usage. You get the red flags before anyone commits to a date.

Phase 2

Rebuild in Canada, IaC first

The target region is built from infrastructure as code, not clicked together, so it is reproducible and reviewable. Where the existing estate is not in code, that gap gets closed as part of the work, which is usually worth having regardless of the migration.

Phase 3

Replicate the data in parallel

Replication runs from the source region while the old region keeps serving production. This is the long pole, and it runs in the background rather than inside a maintenance window, which is what keeps the eventual downtime short.

Phase 4

Staged cutover with rollback

Traffic shifts using weighted DNS rather than a single switch, with the source region still standing and a written rollback path. If something is wrong, the answer is to shift traffic back, not to debug under pressure at 2am.

Phase 5

Decommission, after a stability window

The US region stays up until the Canadian one has been stable for an agreed period. Paying for both for a short while is cheap insurance, and tearing down the old region on cutover day is a decision people regret.

Ready to see what this looks like for your stack? A free scoping call gets you a rough effort estimate and the region-dependency red flags we would expect to find, before you commit to anything.
Proof

A recent US to Canada migration.

We recently completed this exact migration, moving a production workload from US regions to Canada. The client is not named here at their request, and we do not publish details of the engagement beyond confirming the corridor.
The Canadian Landing Zone

Montreal or Calgary. Usually Montreal.

Canada has two AWS regions, each with three Availability Zones, separated by more than three thousand kilometres. Which one you land in is a real decision, not a coin flip.

ca-central-1

Montreal, the default

  • Open since 2016. The older of the two, and the deeper service catalogue.
  • Fewer surprises. Less likely to be missing a service your architecture depends on.
  • Three Availability Zones. Multi-AZ works the way you expect.
  • The usual answer. Most workloads moving north land here unless there is a specific reason not to.
ca-west-1

Calgary, the second site

  • Open since late 2023. Newer, and the catalogue is still narrower than Montreal's.
  • In-country DR. A genuine second Canadian region for disaster recovery without leaving the country.
  • Western latency. Useful if your users are concentrated in the west.
  • Check first. We compare your specific service list against both before recommending it.
The same playbook works for any corridor. Moving into EU regions for European residency, into the UK, into the Gulf or into Australia is the same five phases with different destinations and different drivers. The corridor changes; the fact that the data layer sets the timeline does not.
Common Questions

Moving AWS regions, answered.

If your question is not here, ask it on the call. We would rather tell you the migration is simpler than you feared than sell you a bigger project.

How long does an AWS region migration take?+
Data volume is the driver, not the number of servers. Stateless application tiers can be rebuilt in a new region quickly because infrastructure as code redeploys them, so the timeline is set by how long it takes to replicate the data layer and prove it is consistent. A single application with a modest database is a short engagement; a multi-terabyte estate with several databases and strict cutover windows takes longer, because most of the calendar goes into replication and verification rather than building. We scope it against your actual data sizes and put the timeline in writing before starting.
Can you migrate without downtime?+
Near-zero downtime is achievable for most stacks, and the data layer decides. With replication running from the source region to the target, the application is rebuilt and tested in Canada while the old region keeps serving traffic, and the cutover becomes a short, planned switch rather than a long outage. Where a database cannot replicate live, or licensing or engine constraints force a snapshot-based move, there is a real maintenance window and we tell you its length up front rather than promising zero and discovering otherwise.
What does a region migration cost?+
It is quoted per engagement, because the work scales with the number of workloads and the size and shape of the data rather than with a headline price. Start with a free scoping call: we look at what you run, where the region dependencies are, and what the target region would cost to run, then come back with a fixed scope and a written quote. We share full pricing before any commitment, and if a phased move is cheaper for you than one large project, we will scope it that way.
Do we need to change our code?+
Usually some, and it is rarely the application logic. The common changes are hardcoded region strings and endpoints in application config and infrastructure as code, hardcoded ARNs, region-pinned AMI IDs, and assumptions in CI/CD pipelines about where things deploy. Some services also behave differently or are absent in a newer region, which can force a substitution. The assessment finds these before the migration starts, so they become planned work rather than a surprise on cutover night.
Why not just use the AWS tools ourselves?+
You can, and the tooling is genuinely good: snapshots copy across regions, DMS replicates databases, and infrastructure as code rebuilds environments. What you are buying is not access to those tools, it is the sequencing and the judgment about when to cut over, how to verify the data actually matches, what to do when replication lag spikes, and how to roll back at 2am if the new region misbehaves. Teams that have done this once tend to be fine. Teams doing it for the first time on production usually want someone who has.
Does moving to a Canadian region make us PIPEDA compliant?+
No, and it is worth being precise about that. Keeping data in a Canadian region addresses the residency question, which is often what a customer or a procurement team is actually asking about, but privacy compliance is broader than where the bytes sit: it also covers consent, purpose, retention, access rights, breach handling and your contracts with processors. We build and document the infrastructure side, including region controls and the evidence that data stays where you say it does. Your counsel or privacy officer assesses the legal obligations. We are engineers, not lawyers, and we do not give legal advice.
Which Canadian region should we use?+
ca-central-1 in Montreal is the default for most workloads. It opened in 2016 and has the deeper service catalogue of the two, so it is less likely to be missing something you depend on. ca-west-1 in Calgary opened at the end of 2023 and is useful for in-country disaster recovery, for western latency, or where a second Canadian region is genuinely required, with the two separated by more than three thousand kilometres. Because the Calgary catalogue is still narrower, we check your specific service list against both before recommending one.
Start with a scoping call

30 minutes. An effort estimate and your red flags.

Bring the workloads you need in Canada. You will leave the call with a rough effort estimate and a list of the region dependencies we would expect to trip you up, whether or not you hire us to do the move. If your stack is simpler than you feared, we will say so.

30 min Free Consultation →